Miller Bonded executed the project design, HVAC, plumbing, pipe and duct fabrication for the Banner Thunderbird Medical Center. This included construction of a six story addition to the existing facility, as well as a full basement, mechanical room and central plant addition and upgrades. Miller Bonded worked through project challenges, including undocumented electrical, gas and plumbing lines.
Tasks:
• Project Design/Assist
• HVAC
• Plumbing
• Pipe Fabrication
• Duct Fabrication
• Commissioning
• Training/Start-up
Key Features:
• 298,000 square feet
• Three story North Lobby addition
• New kitchen
• Emergency room
• Patient rooms
|
|
Banner Thunderbird Hospital
» As the largest project completed by Miller Bonded in Arizona, the six story addition to the Banner Thunderbird Hospital presented an array of challenges. Miller Bonded employees worked around undocumented buried electrical, gas and plumbing lines and coordinated city street blockages and shutdowns for large crane mobilization.
|
|